Disaster Recovery Test Report
Test Date: January 24, 2026
Test Result: SUCCESS
All recovery objectives met. No production data impacted.
Test Overview
- Test Type
- Database Restore Drill
- Test Date
- January 24, 2026
- Scope
- Full database restore from automated backup
- Environment
- Isolated test environment (non-production)
Backup Source
Backup Provider: Supabase Automated Backups
Backup Date/Time: January 24, 2026 at 00:00 UTC
Backup Type: Point-in-time recovery (PITR) snapshot
Backup Retention: 7 days (Pro plan)
Test Procedure
- Identified most recent automated backup from Supabase dashboard
- Initiated restore to temporary isolated database instance
- Verified restore completion and database accessibility
- Validated table structure and row counts against production
- Confirmed application connectivity to restored database
- Documented timestamps and observations
- Terminated temporary instance after validation
Observed Recovery Metrics
Recovery Time Objective (RTO)
18 minutes
Target: < 4 hours
Recovery Point Objective (RPO)
24 hours
Based on daily backup schedule
Detailed Timeline
| Timestamp (UTC) | Event |
|---|---|
| 12:00:00 | DR test initiated |
| 12:01:30 | Backup identified and restore initiated |
| 12:12:45 | Database restore completed |
| 12:15:20 | Table validation completed |
| 12:18:00 | Application connectivity verified |
| 12:18:30 | DR test completed successfully |
Validation Results
Production Impact Statement
This disaster recovery test was conducted in an isolated environment. No production systems, data, or services were affected. The test database was terminated immediately after validation.
Next Scheduled Test
Disaster recovery drills are conducted quarterly. The next scheduled test is April 2026.
Related Documentation: